Energy Performance Certificate

Highbury, Broad View, Tondu, CF32 9DF

EPC Report

Energy rating

Current: 62 D | Potential: 78 C
Current Potential A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 62 D Current: 62 D 78 C Potential: 78 C

Environmental impact (CO₂)

Current: 61 | Potential: 75
Current Potential A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 61 Current: 61 75 Potential: 75
Field Value
LMK KEY 0300-2483-5530-2405-5261
ADDRESS1 Highbury
ADDRESS2 Broad View
ADDRESS3 Tondu
POSTCODE CF32 9DF
BUILDING REFERENCE NUMBER
CURRENT ENERGY RATING D
POTENTIAL ENERGY RATING C
CURRENT ENERGY EFFICIENCY 62
POTENTIAL ENERGY EFFICIENCY 78
PROPERTY TYPE House
BUILT FORM Semi-Detached
INSPECTION DATE 2025-07-07
LOCAL AUTHORITY W06000013
CONSTITUENCY W07000086
COUNTY
LODGEMENT DATE 2025-07-08
TRANSACTION TYPE Marketed sale
ENVIRONMENT IMPACT CURRENT 61
ENVIRONMENT IMPACT POTENTIAL 75
ENERGY CONSUMPTION CURRENT 245
ENERGY CONSUMPTION POTENTIAL 150
CO2 EMISSIONS CURRENT 4.5
CO2 EMISS CURR PER FLOOR AREA 42
CO2 EMISSIONS POTENTIAL 2.9
LIGHTING COST CURRENT 99
LIGHTING COST POTENTIAL 65
HEATING COST CURRENT 1467
HEATING COST POTENTIAL 936
HOT WATER COST CURRENT 211
HOT WATER COST POTENTIAL 212
TOTAL FLOOR AREA 106
ENERGY TARIFF Single
MAINS GAS FLAG Y
FLOOR LEVEL
FLAT TOP STOREY N
FLAT STOREY COUNT 2
MAIN HEATING CONTROLS Programmer, TRVs and bypass
MULTI GLAZE PROPORTION 100
GLAZED TYPE
GLAZED AREA
EXTENSION COUNT 2
NUMBER HABITABLE ROOMS 5
NUMBER HEATED ROOMS 5
LOW ENERGY LIGHTING 70
NUMBER OPEN FIREPLACES
HOTWATER DESCRIPTION From main system
HOT WATER ENERGY EFF Good
HOT WATER ENV EFF Good
FLOOR DESCRIPTION Suspended, no insulation (assumed)
FLOOR ENERGY EFF N/A
FLOOR ENV EFF N/A
WINDOWS DESCRIPTION Fully double glazed
WINDOWS ENERGY EFF Average
WINDOWS ENV EFF Average
WALLS DESCRIPTION Solid brick, as built, no insulation (assumed)
WALLS ENERGY EFF Poor
WALLS ENV EFF Poor
SECONDHEAT DESCRIPTION Room heaters, dual fuel (mineral and wood)
SHEATING ENERGY EFF N/A
SHEATING ENV EFF N/A
ROOF DESCRIPTION Pitched, 100 mm loft insulation
ROOF ENERGY EFF Average
ROOF ENV EFF Average
MAINHEAT DESCRIPTION Boiler and radiators, mains gas
MAINHEAT ENERGY EFF Good
MAINHEAT ENV EFF Good
MAINHEATCONT DESCRIPTION Programmer, TRVs and bypass
MAINHEATC ENERGY EFF Average
MAINHEATC ENV EFF Average
LIGHTING DESCRIPTION Below average lighting efficiency
LIGHTING ENERGY EFF Poor
LIGHTING ENV EFF Poor
MAIN FUEL mains gas (not community)
WIND TURBINE COUNT 0
HEAT LOSS CORRIDOR
UNHEATED CORRIDOR LENGTH
FLOOR HEIGHT 2.72
PHOTO SUPPLY 0
SOLAR WATER HEATING FLAG N
MECHANICAL VENTILATION natural
ADDRESS Highbury, Broad View, Tondu
LOCAL AUTHORITY LABEL Bridgend
CONSTITUENCY LABEL Bridgend
POSTTOWN BRIDGEND
CONSTRUCTION AGE BAND England and Wales: 1900-1929
LODGEMENT DATETIME 2025-07-08 17:38:39
TENURE owner-occupied
FIXED LIGHTING OUTLETS COUNT 20
LOW ENERGY FIXED LIGHT COUNT 14
UPRN 100100520623
UPRN SOURCE Energy Assessor
REPORT TYPE 2
Source file certificates-2025.csv
COUNTRY Wales
REGION W99999999
Address display
Nation ew