Energy Performance Certificate

201 Chingford Road, B44 0BL

EPC Report

Energy rating

Current: 21 F | Potential: 89 B
Current Potential A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 21 F Current: 21 F 89 B Potential: 89 B

Environmental impact (CO₂)

Current: 33 | Potential: 88
Current Potential A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 33 Current: 33 88 Potential: 88
Field Value
LMK KEY 0300-2152-0110-2902-0935
ADDRESS1 201 Chingford Road
ADDRESS2
ADDRESS3
POSTCODE B44 0BL
BUILDING REFERENCE NUMBER
CURRENT ENERGY RATING F
POTENTIAL ENERGY RATING B
CURRENT ENERGY EFFICIENCY 21
POTENTIAL ENERGY EFFICIENCY 89
PROPERTY TYPE House
BUILT FORM Mid-Terrace
INSPECTION DATE 2022-09-02
LOCAL AUTHORITY E08000025
CONSTITUENCY E14001093
COUNTY
LODGEMENT DATE 2022-09-02
TRANSACTION TYPE Marketed sale
ENVIRONMENT IMPACT CURRENT 33
ENVIRONMENT IMPACT POTENTIAL 88
ENERGY CONSUMPTION CURRENT 529
ENERGY CONSUMPTION POTENTIAL 73
CO2 EMISSIONS CURRENT 6.5
CO2 EMISS CURR PER FLOOR AREA 90
CO2 EMISSIONS POTENTIAL 1.0
LIGHTING COST CURRENT 117
LIGHTING COST POTENTIAL 62
HEATING COST CURRENT 1801
HEATING COST POTENTIAL 327
HOT WATER COST CURRENT 402
HOT WATER COST POTENTIAL 65
TOTAL FLOOR AREA 72
ENERGY TARIFF Single
MAINS GAS FLAG Y
FLOOR LEVEL
FLAT TOP STOREY N
FLAT STOREY COUNT 2
MAIN HEATING CONTROLS No thermostatic control of room temperature
MULTI GLAZE PROPORTION 100
GLAZED TYPE double glazing, unknown install date
GLAZED AREA Normal
EXTENSION COUNT 2
NUMBER HABITABLE ROOMS 4
NUMBER HEATED ROOMS 1
LOW ENERGY LIGHTING 11
NUMBER OPEN FIREPLACES 0
HOTWATER DESCRIPTION Electric immersion, standard tariff
HOT WATER ENERGY EFF Very Poor
HOT WATER ENV EFF Poor
FLOOR DESCRIPTION Solid, no insulation (assumed)
FLOOR ENERGY EFF N/A
FLOOR ENV EFF N/A
WINDOWS DESCRIPTION Fully double glazed
WINDOWS ENERGY EFF Average
WINDOWS ENV EFF Average
WALLS DESCRIPTION Solid brick, as built, no insulation (assumed)
WALLS ENERGY EFF Very Poor
WALLS ENV EFF Very Poor
SECONDHEAT DESCRIPTION Room heaters, mains gas
SHEATING ENERGY EFF N/A
SHEATING ENV EFF N/A
ROOF DESCRIPTION Pitched, 200 mm loft insulation
ROOF ENERGY EFF Good
ROOF ENV EFF Good
MAINHEAT DESCRIPTION Portable electric heaters assumed for most rooms
MAINHEAT ENERGY EFF Very Poor
MAINHEAT ENV EFF Poor
MAINHEATCONT DESCRIPTION No thermostatic control of room temperature
MAINHEATC ENERGY EFF Poor
MAINHEATC ENV EFF Poor
LIGHTING DESCRIPTION Low energy lighting in 11% of fixed outlets
LIGHTING ENERGY EFF Poor
LIGHTING ENV EFF Poor
MAIN FUEL mains gas (not community)
WIND TURBINE COUNT 0
HEAT LOSS CORRIDOR
UNHEATED CORRIDOR LENGTH
FLOOR HEIGHT 2.44
PHOTO SUPPLY 0
SOLAR WATER HEATING FLAG N
MECHANICAL VENTILATION natural
ADDRESS 201 Chingford Road
LOCAL AUTHORITY LABEL Birmingham
CONSTITUENCY LABEL Birmingham Erdington
POSTTOWN BIRMINGHAM
CONSTRUCTION AGE BAND England and Wales: 1930-1949
LODGEMENT DATETIME 2022-09-02 13:33:40
TENURE owner-occupied
FIXED LIGHTING OUTLETS COUNT 9
LOW ENERGY FIXED LIGHT COUNT 1
UPRN 100070323474
UPRN SOURCE Energy Assessor
REPORT TYPE 2
Source file certificates-2022.csv
COUNTRY England
REGION E12000005
Address display
Nation ew