Energy Performance Certificate

15 Cherry Orchard, HP6 6LE

EPC Report

Energy rating

Current: 72 C | Potential: 78 C
Current Potential A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 72 C Current: 72 C 78 C Potential: 78 C

Environmental impact (CO₂)

Current: 72 | Potential: 80
Current Potential A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 72 Current: 72 80 Potential: 80
Field Value
LMK KEY 0272-1208-9705-9447-0304
ADDRESS1 15 Cherry Orchard
ADDRESS2
ADDRESS3
POSTCODE HP6 6LE
BUILDING REFERENCE NUMBER
CURRENT ENERGY RATING C
POTENTIAL ENERGY RATING C
CURRENT ENERGY EFFICIENCY 72
POTENTIAL ENERGY EFFICIENCY 78
PROPERTY TYPE Flat
BUILT FORM Semi-Detached
INSPECTION DATE 2025-03-24
LOCAL AUTHORITY E06000060
CONSTITUENCY E14001162
COUNTY
LODGEMENT DATE 2025-03-24
TRANSACTION TYPE Marketed sale
ENVIRONMENT IMPACT CURRENT 72
ENVIRONMENT IMPACT POTENTIAL 80
ENERGY CONSUMPTION CURRENT 205
ENERGY CONSUMPTION POTENTIAL 149
CO2 EMISSIONS CURRENT 2.2
CO2 EMISS CURR PER FLOOR AREA 36
CO2 EMISSIONS POTENTIAL 1.6
LIGHTING COST CURRENT 70
LIGHTING COST POTENTIAL 70
HEATING COST CURRENT 577
HEATING COST POTENTIAL 412
HOT WATER COST CURRENT 111
HOT WATER COST POTENTIAL 111
TOTAL FLOOR AREA 60
ENERGY TARIFF Single
MAINS GAS FLAG Y
FLOOR LEVEL 1
FLAT TOP STOREY N
FLAT STOREY COUNT 1
MAIN HEATING CONTROLS Programmer, room thermostat and TRVs
MULTI GLAZE PROPORTION 100
GLAZED TYPE double glazing installed during or after 2002
GLAZED AREA Normal
EXTENSION COUNT 0
NUMBER HABITABLE ROOMS 3
NUMBER HEATED ROOMS 3
LOW ENERGY LIGHTING 100
NUMBER OPEN FIREPLACES 0
HOTWATER DESCRIPTION From main system
HOT WATER ENERGY EFF Good
HOT WATER ENV EFF Good
FLOOR DESCRIPTION Solid, no insulation (assumed)
FLOOR ENERGY EFF N/A
FLOOR ENV EFF N/A
WINDOWS DESCRIPTION Fully double glazed
WINDOWS ENERGY EFF Good
WINDOWS ENV EFF Good
WALLS DESCRIPTION Cavity wall, as built, no insulation (assumed)
WALLS ENERGY EFF Poor
WALLS ENV EFF Poor
SECONDHEAT DESCRIPTION None
SHEATING ENERGY EFF N/A
SHEATING ENV EFF N/A
ROOF DESCRIPTION (another dwelling above)
ROOF ENERGY EFF N/A
ROOF ENV EFF N/A
MAINHEAT DESCRIPTION Boiler and radiators, mains gas
MAINHEAT ENERGY EFF Good
MAINHEAT ENV EFF Good
MAINHEATCONT DESCRIPTION Programmer, room thermostat and TRVs
MAINHEATC ENERGY EFF Good
MAINHEATC ENV EFF Good
LIGHTING DESCRIPTION Low energy lighting in all fixed outlets
LIGHTING ENERGY EFF Very Good
LIGHTING ENV EFF Very Good
MAIN FUEL mains gas (not community)
WIND TURBINE COUNT 0
HEAT LOSS CORRIDOR no corridor
UNHEATED CORRIDOR LENGTH
FLOOR HEIGHT 2.26
PHOTO SUPPLY 0
SOLAR WATER HEATING FLAG N
MECHANICAL VENTILATION natural
ADDRESS 15 Cherry Orchard
LOCAL AUTHORITY LABEL Buckinghamshire
CONSTITUENCY LABEL Chesham and Amersham
POSTTOWN AMERSHAM
CONSTRUCTION AGE BAND England and Wales: 1967-1975
LODGEMENT DATETIME 2025-03-24 20:00:08
TENURE owner-occupied
FIXED LIGHTING OUTLETS COUNT 7
LOW ENERGY FIXED LIGHT COUNT 7
UPRN 100080499237
UPRN SOURCE Energy Assessor
REPORT TYPE 2
Source file certificates-2025.csv
COUNTRY England
REGION E12000008
Address display
Nation ew