Energy Performance Certificate

109, Ritson Street, L8 0UE

EPC Report

Energy rating

Current: 33 F | Potential: 84 B
Current Potential A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 33 F Current: 33 F 84 B Potential: 84 B

Environmental impact (CO₂)

Current: 34 | Potential: 82
Current Potential A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 34 Current: 34 82 Potential: 82
Field Value
LMK KEY 0264-2893-7324-2000-2121
ADDRESS1 109, Ritson Street
ADDRESS2
ADDRESS3
POSTCODE L8 0UE
BUILDING REFERENCE NUMBER
CURRENT ENERGY RATING F
POTENTIAL ENERGY RATING B
CURRENT ENERGY EFFICIENCY 33
POTENTIAL ENERGY EFFICIENCY 84
PROPERTY TYPE House
BUILT FORM Mid-Terrace
INSPECTION DATE 2020-02-07
LOCAL AUTHORITY E08000012
CONSTITUENCY E14001338
COUNTY
LODGEMENT DATE 2020-02-07
TRANSACTION TYPE Marketed sale
ENVIRONMENT IMPACT CURRENT 34
ENVIRONMENT IMPACT POTENTIAL 82
ENERGY CONSUMPTION CURRENT 534
ENERGY CONSUMPTION POTENTIAL 111
CO2 EMISSIONS CURRENT 5.3
CO2 EMISS CURR PER FLOOR AREA 93
CO2 EMISSIONS POTENTIAL 1.2
LIGHTING COST CURRENT 71
LIGHTING COST POTENTIAL 46
HEATING COST CURRENT 865
HEATING COST POTENTIAL 390
HOT WATER COST CURRENT 403
HOT WATER COST POTENTIAL 63
TOTAL FLOOR AREA 57
ENERGY TARIFF Single
MAINS GAS FLAG Y
FLOOR LEVEL
FLAT TOP STOREY N
FLAT STOREY COUNT 2
MAIN HEATING CONTROLS Appliance thermostats
MULTI GLAZE PROPORTION 100
GLAZED TYPE double glazing, unknown install date
GLAZED AREA Normal
EXTENSION COUNT 1
NUMBER HABITABLE ROOMS 3
NUMBER HEATED ROOMS 2
LOW ENERGY LIGHTING 44
NUMBER OPEN FIREPLACES 0
HOTWATER DESCRIPTION Electric immersion, standard tariff
HOT WATER ENERGY EFF Very Poor
HOT WATER ENV EFF Poor
FLOOR DESCRIPTION Solid, no insulation (assumed)
FLOOR ENERGY EFF N/A
FLOOR ENV EFF N/A
WINDOWS DESCRIPTION Fully double glazed
WINDOWS ENERGY EFF Average
WINDOWS ENV EFF Average
WALLS DESCRIPTION Solid brick, as built, no insulation (assumed)
WALLS ENERGY EFF Very Poor
WALLS ENV EFF Very Poor
SECONDHEAT DESCRIPTION Portable electric heaters (assumed)
SHEATING ENERGY EFF N/A
SHEATING ENV EFF N/A
ROOF DESCRIPTION Pitched, no insulation (assumed)
ROOF ENERGY EFF Very Poor
ROOF ENV EFF Very Poor
MAINHEAT DESCRIPTION Room heaters, mains gas
MAINHEAT ENERGY EFF Average
MAINHEAT ENV EFF Average
MAINHEATCONT DESCRIPTION Appliance thermostats
MAINHEATC ENERGY EFF Good
MAINHEATC ENV EFF Good
LIGHTING DESCRIPTION Low energy lighting in 44% of fixed outlets
LIGHTING ENERGY EFF Average
LIGHTING ENV EFF Average
MAIN FUEL mains gas (not community)
WIND TURBINE COUNT 0
HEAT LOSS CORRIDOR
UNHEATED CORRIDOR LENGTH
FLOOR HEIGHT 2.6
PHOTO SUPPLY 0
SOLAR WATER HEATING FLAG N
MECHANICAL VENTILATION natural
ADDRESS 109, Ritson Street
LOCAL AUTHORITY LABEL Liverpool
CONSTITUENCY LABEL Liverpool Riverside
POSTTOWN LIVERPOOL
CONSTRUCTION AGE BAND England and Wales: 1900-1929
LODGEMENT DATETIME 2020-02-07 22:13:03
TENURE owner-occupied
FIXED LIGHTING OUTLETS COUNT 9
LOW ENERGY FIXED LIGHT COUNT 4
UPRN 38127725
UPRN SOURCE Energy Assessor
REPORT TYPE 2
Source file certificates-2020.csv
COUNTRY England
REGION E12000002
Address display
Nation ew