Energy Performance Certificate

217, Tiverton Road, B29 6DB

EPC Report

Energy rating

Current: 68 D | Potential: 82 B
Current Potential A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 68 D Current: 68 D 82 B Potential: 82 B

Environmental impact (CO₂)

Current: 62 | Potential: 79
Current Potential A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 62 Current: 62 79 Potential: 79
Field Value
LMK KEY 0259-2840-6873-9671-3115
ADDRESS1 217, Tiverton Road
ADDRESS2
ADDRESS3
POSTCODE B29 6DB
BUILDING REFERENCE NUMBER
CURRENT ENERGY RATING D
POTENTIAL ENERGY RATING B
CURRENT ENERGY EFFICIENCY 68
POTENTIAL ENERGY EFFICIENCY 82
PROPERTY TYPE House
BUILT FORM Mid-Terrace
INSPECTION DATE 2019-03-30
LOCAL AUTHORITY E08000025
CONSTITUENCY E14001099
COUNTY
LODGEMENT DATE 2019-04-02
TRANSACTION TYPE Rental
ENVIRONMENT IMPACT CURRENT 62
ENVIRONMENT IMPACT POTENTIAL 79
ENERGY CONSUMPTION CURRENT 220
ENERGY CONSUMPTION POTENTIAL 121
CO2 EMISSIONS CURRENT 4.6
CO2 EMISS CURR PER FLOOR AREA 39
CO2 EMISSIONS POTENTIAL 2.6
LIGHTING COST CURRENT 82
LIGHTING COST POTENTIAL 82
HEATING COST CURRENT 781
HEATING COST POTENTIAL 610
HOT WATER COST CURRENT 112
HOT WATER COST POTENTIAL 77
TOTAL FLOOR AREA 119
ENERGY TARIFF Single
MAINS GAS FLAG Y
FLOOR LEVEL
FLAT TOP STOREY N
FLAT STOREY COUNT 2
MAIN HEATING CONTROLS Programmer, TRVs and bypass
MULTI GLAZE PROPORTION 100
GLAZED TYPE double glazing, unknown install date
GLAZED AREA Normal
EXTENSION COUNT 2
NUMBER HABITABLE ROOMS 7
NUMBER HEATED ROOMS 7
LOW ENERGY LIGHTING 94
NUMBER OPEN FIREPLACES 0
HOTWATER DESCRIPTION From main system
HOT WATER ENERGY EFF Good
HOT WATER ENV EFF Good
FLOOR DESCRIPTION Suspended, no insulation (assumed)
FLOOR ENERGY EFF N/A
FLOOR ENV EFF N/A
WINDOWS DESCRIPTION Fully double glazed
WINDOWS ENERGY EFF Average
WINDOWS ENV EFF Average
WALLS DESCRIPTION Solid brick, as built, no insulation (assumed)
WALLS ENERGY EFF Very Poor
WALLS ENV EFF Very Poor
SECONDHEAT DESCRIPTION None
SHEATING ENERGY EFF N/A
SHEATING ENV EFF N/A
ROOF DESCRIPTION Pitched, insulated (assumed)
ROOF ENERGY EFF Good
ROOF ENV EFF Good
MAINHEAT DESCRIPTION Boiler and radiators, mains gas
MAINHEAT ENERGY EFF Good
MAINHEAT ENV EFF Good
MAINHEATCONT DESCRIPTION Programmer, TRVs and bypass
MAINHEATC ENERGY EFF Average
MAINHEATC ENV EFF Average
LIGHTING DESCRIPTION Low energy lighting in 94% of fixed outlets
LIGHTING ENERGY EFF Very Good
LIGHTING ENV EFF Very Good
MAIN FUEL mains gas (not community)
WIND TURBINE COUNT 0
HEAT LOSS CORRIDOR
UNHEATED CORRIDOR LENGTH
FLOOR HEIGHT 2.6
PHOTO SUPPLY 0
SOLAR WATER HEATING FLAG N
MECHANICAL VENTILATION natural
ADDRESS 217, Tiverton Road
LOCAL AUTHORITY LABEL Birmingham
CONSTITUENCY LABEL Birmingham Selly Oak
POSTTOWN BIRMINGHAM
CONSTRUCTION AGE BAND England and Wales: 1900-1929
LODGEMENT DATETIME 2019-04-02 16:08:25
TENURE rented (private)
FIXED LIGHTING OUTLETS COUNT 17
LOW ENERGY FIXED LIGHT COUNT 16
UPRN 100070541126
UPRN SOURCE Energy Assessor
REPORT TYPE 2
Source file certificates-2019.csv
COUNTRY England
REGION E12000005
Address display
Nation ew