Energy Performance Certificate

2, Cambridge Street, Great Harwood, BB6 7BU

EPC Report

Energy rating

Current: 19 G | Potential: 82 B
Current Potential A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 19 G Current: 19 G 82 B Potential: 82 B

Environmental impact (CO₂)

Current: 21 | Potential: 81
Current Potential A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 21 Current: 21 81 Potential: 81
Field Value
LMK KEY 0204-2807-7131-9507-3635
ADDRESS1 2, Cambridge Street
ADDRESS2 Great Harwood
ADDRESS3
POSTCODE BB6 7BU
BUILDING REFERENCE NUMBER
CURRENT ENERGY RATING G
POTENTIAL ENERGY RATING B
CURRENT ENERGY EFFICIENCY 19
POTENTIAL ENERGY EFFICIENCY 82
PROPERTY TYPE House
BUILT FORM End-Terrace
INSPECTION DATE 2013-07-03
LOCAL AUTHORITY E07000120
CONSTITUENCY E14001299
COUNTY
LODGEMENT DATE 2013-07-04
TRANSACTION TYPE Marketed sale
ENVIRONMENT IMPACT CURRENT 21
ENVIRONMENT IMPACT POTENTIAL 81
ENERGY CONSUMPTION CURRENT 561
ENERGY CONSUMPTION POTENTIAL 101
CO2 EMISSIONS CURRENT 11
CO2 EMISS CURR PER FLOOR AREA 107
CO2 EMISSIONS POTENTIAL 2.0
LIGHTING COST CURRENT 101
LIGHTING COST POTENTIAL 57
HEATING COST CURRENT 1732
HEATING COST POTENTIAL 556
HOT WATER COST CURRENT 481
HOT WATER COST POTENTIAL 69
TOTAL FLOOR AREA 103
ENERGY TARIFF Single
MAINS GAS FLAG
FLOOR LEVEL
FLAT TOP STOREY N
FLAT STOREY COUNT 2
MAIN HEATING CONTROLS No thermostatic control of room temperature
MULTI GLAZE PROPORTION 45
GLAZED TYPE
GLAZED AREA
EXTENSION COUNT 1
NUMBER HABITABLE ROOMS 6
NUMBER HEATED ROOMS 2
LOW ENERGY LIGHTING 20
NUMBER OPEN FIREPLACES 0
HOTWATER DESCRIPTION No system present: electric immersion assumed
HOT WATER ENERGY EFF Very Poor
HOT WATER ENV EFF Very Poor
FLOOR DESCRIPTION Suspended, no insulation (assumed)
FLOOR ENERGY EFF N/A
FLOOR ENV EFF N/A
WINDOWS DESCRIPTION Partial double glazing
WINDOWS ENERGY EFF Poor
WINDOWS ENV EFF Poor
WALLS DESCRIPTION Sandstone, as built, no insulation (assumed)
WALLS ENERGY EFF Very Poor
WALLS ENV EFF Very Poor
SECONDHEAT DESCRIPTION Room heaters, mains gas
SHEATING ENERGY EFF N/A
SHEATING ENV EFF N/A
ROOF DESCRIPTION Pitched, 50 mm loft insulation
ROOF ENERGY EFF Poor
ROOF ENV EFF Poor
MAINHEAT DESCRIPTION Room heaters, mains gas
MAINHEAT ENERGY EFF Average
MAINHEAT ENV EFF Average
MAINHEATCONT DESCRIPTION No thermostatic control of room temperature
MAINHEATC ENERGY EFF Poor
MAINHEATC ENV EFF Poor
LIGHTING DESCRIPTION Low energy lighting in 20% of fixed outlets
LIGHTING ENERGY EFF Poor
LIGHTING ENV EFF Poor
MAIN FUEL mains gas (not community)
WIND TURBINE COUNT 0
HEAT LOSS CORRIDOR
UNHEATED CORRIDOR LENGTH
FLOOR HEIGHT 2.84
PHOTO SUPPLY
SOLAR WATER HEATING FLAG N
MECHANICAL VENTILATION natural
ADDRESS 2, Cambridge Street, Great Harwood
LOCAL AUTHORITY LABEL Hyndburn
CONSTITUENCY LABEL Hyndburn
POSTTOWN BLACKBURN
CONSTRUCTION AGE BAND England and Wales: 1900-1929
LODGEMENT DATETIME 2013-07-04 12:39:09
TENURE Owner-occupied
FIXED LIGHTING OUTLETS COUNT 10
LOW ENERGY FIXED LIGHT COUNT 2
UPRN 100010446684
UPRN SOURCE Energy Assessor
REPORT TYPE 2
Source file certificates-2013.csv
COUNTRY England
REGION E12000002
Address display
Nation ew