Energy Performance Certificate

85, Maynard Road, Edgbaston, B16 0PW

EPC Report

Energy rating

Current: 78 C | Potential: 81 B
Current Potential A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 78 C Current: 78 C 81 B Potential: 81 B

Environmental impact (CO₂)

Current: 82 | Potential: 85
Current Potential A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 82 Current: 82 85 Potential: 85
Field Value
LMK KEY 0168-2801-7681-9028-8191
ADDRESS1 85, Maynard Road
ADDRESS2 Edgbaston
ADDRESS3
POSTCODE B16 0PW
BUILDING REFERENCE NUMBER
CURRENT ENERGY RATING C
POTENTIAL ENERGY RATING B
CURRENT ENERGY EFFICIENCY 78
POTENTIAL ENERGY EFFICIENCY 81
PROPERTY TYPE Flat
BUILT FORM Mid-Terrace
INSPECTION DATE 2018-08-29
LOCAL AUTHORITY E08000028
CONSTITUENCY E14001478
COUNTY
LODGEMENT DATE 2018-08-29
TRANSACTION TYPE Rental
ENVIRONMENT IMPACT CURRENT 82
ENVIRONMENT IMPACT POTENTIAL 85
ENERGY CONSUMPTION CURRENT 144
ENERGY CONSUMPTION POTENTIAL 116
CO2 EMISSIONS CURRENT 1.3
CO2 EMISS CURR PER FLOOR AREA 25
CO2 EMISSIONS POTENTIAL 1.1
LIGHTING COST CURRENT 74
LIGHTING COST POTENTIAL 43
HEATING COST CURRENT 196
HEATING COST POTENTIAL 185
HOT WATER COST CURRENT 103
HOT WATER COST POTENTIAL 84
TOTAL FLOOR AREA 52
ENERGY TARIFF Single
MAINS GAS FLAG Y
FLOOR LEVEL 2
FLAT TOP STOREY N
FLAT STOREY COUNT 1
MAIN HEATING CONTROLS Programmer, room thermostat and TRVs
MULTI GLAZE PROPORTION 100
GLAZED TYPE double glazing, unknown install date
GLAZED AREA Normal
EXTENSION COUNT 0
NUMBER HABITABLE ROOMS 3
NUMBER HEATED ROOMS 3
LOW ENERGY LIGHTING 29
NUMBER OPEN FIREPLACES 0
HOTWATER DESCRIPTION From main system
HOT WATER ENERGY EFF Good
HOT WATER ENV EFF Good
FLOOR DESCRIPTION (another dwelling below)
FLOOR ENERGY EFF N/A
FLOOR ENV EFF N/A
WINDOWS DESCRIPTION Fully double glazed
WINDOWS ENERGY EFF Average
WINDOWS ENV EFF Average
WALLS DESCRIPTION Cavity wall, as built, insulated (assumed)
WALLS ENERGY EFF Good
WALLS ENV EFF Good
SECONDHEAT DESCRIPTION None
SHEATING ENERGY EFF N/A
SHEATING ENV EFF N/A
ROOF DESCRIPTION (another dwelling above)
ROOF ENERGY EFF N/A
ROOF ENV EFF N/A
MAINHEAT DESCRIPTION Boiler and radiators, mains gas
MAINHEAT ENERGY EFF Good
MAINHEAT ENV EFF Good
MAINHEATCONT DESCRIPTION Programmer, room thermostat and TRVs
MAINHEATC ENERGY EFF Good
MAINHEATC ENV EFF Good
LIGHTING DESCRIPTION Low energy lighting in 29% of fixed outlets
LIGHTING ENERGY EFF Average
LIGHTING ENV EFF Average
MAIN FUEL mains gas (not community)
WIND TURBINE COUNT 0
HEAT LOSS CORRIDOR heated corridor
UNHEATED CORRIDOR LENGTH
FLOOR HEIGHT 2.3
PHOTO SUPPLY 0
SOLAR WATER HEATING FLAG N
MECHANICAL VENTILATION natural
ADDRESS 85, Maynard Road, Edgbaston
LOCAL AUTHORITY LABEL Sandwell
CONSTITUENCY LABEL Smethwick
POSTTOWN BIRMINGHAM
CONSTRUCTION AGE BAND England and Wales: 1996-2002
LODGEMENT DATETIME 2018-08-29 19:32:56
TENURE rented (private)
FIXED LIGHTING OUTLETS COUNT 7
LOW ENERGY FIXED LIGHT COUNT 2
UPRN 10008755160
UPRN SOURCE Energy Assessor
REPORT TYPE 2
Source file certificates-2018.csv
COUNTRY England
REGION E12000005
Address display
Nation ew