Energy Performance Certificate

11, Barkestone Lane, Plungar, NG13 0JA

EPC Report

Energy rating

Current: 65 D | Potential: 77 C
Current Potential A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 65 D Current: 65 D 77 C Potential: 77 C

Environmental impact (CO₂)

Current: 63 | Potential: 76
Current Potential A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 63 Current: 63 76 Potential: 76
Field Value
LMK KEY 0152-2862-6922-9626-2531
ADDRESS1 11, Barkestone Lane
ADDRESS2 Plungar
ADDRESS3
POSTCODE NG13 0JA
BUILDING REFERENCE NUMBER
CURRENT ENERGY RATING D
POTENTIAL ENERGY RATING C
CURRENT ENERGY EFFICIENCY 65
POTENTIAL ENERGY EFFICIENCY 77
PROPERTY TYPE House
BUILT FORM Detached
INSPECTION DATE 2016-02-22
LOCAL AUTHORITY E07000133
CONSTITUENCY E14001357
COUNTY
LODGEMENT DATE 2016-02-22
TRANSACTION TYPE Non-marketed sale
ENVIRONMENT IMPACT CURRENT 63
ENVIRONMENT IMPACT POTENTIAL 76
ENERGY CONSUMPTION CURRENT 223
ENERGY CONSUMPTION POTENTIAL 147
CO2 EMISSIONS CURRENT 4.5
CO2 EMISS CURR PER FLOOR AREA 36
CO2 EMISSIONS POTENTIAL 2.9
LIGHTING COST CURRENT 117
LIGHTING COST POTENTIAL 78
HEATING COST CURRENT 865
HEATING COST POTENTIAL 829
HOT WATER COST CURRENT 170
HOT WATER COST POTENTIAL 91
TOTAL FLOOR AREA 124
ENERGY TARIFF dual
MAINS GAS FLAG Y
FLOOR LEVEL
FLAT TOP STOREY N
FLAT STOREY COUNT
MAIN HEATING CONTROLS Programmer, room thermostat and TRVs
MULTI GLAZE PROPORTION 100
GLAZED TYPE double glazing, unknown install date
GLAZED AREA Normal
EXTENSION COUNT 1
NUMBER HABITABLE ROOMS 7
NUMBER HEATED ROOMS 7
LOW ENERGY LIGHTING 50
NUMBER OPEN FIREPLACES 0
HOTWATER DESCRIPTION From main system
HOT WATER ENERGY EFF Good
HOT WATER ENV EFF Good
FLOOR DESCRIPTION Solid, no insulation (assumed)
FLOOR ENERGY EFF N/A
FLOOR ENV EFF N/A
WINDOWS DESCRIPTION Fully double glazed
WINDOWS ENERGY EFF Average
WINDOWS ENV EFF Average
WALLS DESCRIPTION Cavity wall, as built, insulated (assumed)
WALLS ENERGY EFF Good
WALLS ENV EFF Good
SECONDHEAT DESCRIPTION Room heaters, wood logs
SHEATING ENERGY EFF N/A
SHEATING ENV EFF N/A
ROOF DESCRIPTION Pitched, 300 mm loft insulation
ROOF ENERGY EFF Very Good
ROOF ENV EFF Very Good
MAINHEAT DESCRIPTION Boiler and radiators, mains gas
MAINHEAT ENERGY EFF Good
MAINHEAT ENV EFF Good
MAINHEATCONT DESCRIPTION Programmer, room thermostat and TRVs
MAINHEATC ENERGY EFF Good
MAINHEATC ENV EFF Good
LIGHTING DESCRIPTION Low energy lighting in 50% of fixed outlets
LIGHTING ENERGY EFF Good
LIGHTING ENV EFF Good
MAIN FUEL mains gas (not community)
WIND TURBINE COUNT 0
HEAT LOSS CORRIDOR
UNHEATED CORRIDOR LENGTH
FLOOR HEIGHT 1.5
PHOTO SUPPLY 0
SOLAR WATER HEATING FLAG N
MECHANICAL VENTILATION natural
ADDRESS 11, Barkestone Lane, Plungar
LOCAL AUTHORITY LABEL Melton
CONSTITUENCY LABEL Melton and Syston
POSTTOWN NOTTINGHAM
CONSTRUCTION AGE BAND England and Wales: 1991-1995
LODGEMENT DATETIME 2016-02-22 21:01:14
TENURE owner-occupied
FIXED LIGHTING OUTLETS COUNT 20
LOW ENERGY FIXED LIGHT COUNT 10
UPRN 100030549171
UPRN SOURCE Energy Assessor
REPORT TYPE 2
Source file certificates-2016.csv
COUNTRY England
REGION E12000004
Address display
Nation ew