Energy Performance Certificate

13 Castlegate, Gipsey Bridge, PE22 7BS

EPC Report

Energy rating

Current: 26 F | Potential: 70 C
Current Potential A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 26 F Current: 26 F 70 C Potential: 70 C

Environmental impact (CO₂)

Current: 20 | Potential: 49
Current Potential A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 20 Current: 20 49 Potential: 49
Field Value
LMK KEY 0150-2876-2010-2009-3311
ADDRESS1 13 Castlegate
ADDRESS2 Gipsey Bridge
ADDRESS3
POSTCODE PE22 7BS
BUILDING REFERENCE NUMBER
CURRENT ENERGY RATING F
POTENTIAL ENERGY RATING C
CURRENT ENERGY EFFICIENCY 26
POTENTIAL ENERGY EFFICIENCY 70
PROPERTY TYPE House
BUILT FORM Detached
INSPECTION DATE 2021-09-06
LOCAL AUTHORITY E07000137
CONSTITUENCY E14001114
COUNTY
LODGEMENT DATE 2021-09-06
TRANSACTION TYPE Marketed sale
ENVIRONMENT IMPACT CURRENT 20
ENVIRONMENT IMPACT POTENTIAL 49
ENERGY CONSUMPTION CURRENT 622
ENERGY CONSUMPTION POTENTIAL 298
CO2 EMISSIONS CURRENT 12
CO2 EMISS CURR PER FLOOR AREA 109
CO2 EMISSIONS POTENTIAL 5.9
LIGHTING COST CURRENT 93
LIGHTING COST POTENTIAL 93
HEATING COST CURRENT 2326
HEATING COST POTENTIAL 1229
HOT WATER COST CURRENT 507
HOT WATER COST POTENTIAL 130
TOTAL FLOOR AREA 113
ENERGY TARIFF dual
MAINS GAS FLAG N
FLOOR LEVEL
FLAT TOP STOREY N
FLAT STOREY COUNT 1
MAIN HEATING CONTROLS Manual charge control
MULTI GLAZE PROPORTION 100
GLAZED TYPE double glazing, unknown install date
GLAZED AREA Normal
EXTENSION COUNT 2
NUMBER HABITABLE ROOMS 5
NUMBER HEATED ROOMS 5
LOW ENERGY LIGHTING 100
NUMBER OPEN FIREPLACES 0
HOTWATER DESCRIPTION Electric immersion, off-peak
HOT WATER ENERGY EFF Very Poor
HOT WATER ENV EFF Poor
FLOOR DESCRIPTION Solid, no insulation (assumed)
FLOOR ENERGY EFF N/A
FLOOR ENV EFF N/A
WINDOWS DESCRIPTION Fully double glazed
WINDOWS ENERGY EFF Average
WINDOWS ENV EFF Average
WALLS DESCRIPTION Cavity wall, filled cavity
WALLS ENERGY EFF Average
WALLS ENV EFF Average
SECONDHEAT DESCRIPTION Room heaters, LPG
SHEATING ENERGY EFF N/A
SHEATING ENV EFF N/A
ROOF DESCRIPTION Pitched, limited insulation (assumed)
ROOF ENERGY EFF Very Poor
ROOF ENV EFF Very Poor
MAINHEAT DESCRIPTION Electric storage heaters
MAINHEAT ENERGY EFF Average
MAINHEAT ENV EFF Very Poor
MAINHEATCONT DESCRIPTION Manual charge control
MAINHEATC ENERGY EFF Poor
MAINHEATC ENV EFF Poor
LIGHTING DESCRIPTION Low energy lighting in all fixed outlets
LIGHTING ENERGY EFF Very Good
LIGHTING ENV EFF Very Good
MAIN FUEL electricity (not community)
WIND TURBINE COUNT 0
HEAT LOSS CORRIDOR
UNHEATED CORRIDOR LENGTH
FLOOR HEIGHT 2.4
PHOTO SUPPLY 0
SOLAR WATER HEATING FLAG N
MECHANICAL VENTILATION natural
ADDRESS 13 Castlegate, Gipsey Bridge
LOCAL AUTHORITY LABEL East Lindsey
CONSTITUENCY LABEL Boston and Skegness
POSTTOWN BOSTON
CONSTRUCTION AGE BAND England and Wales: 1967-1975
LODGEMENT DATETIME 2021-09-06 15:04:33
TENURE owner-occupied
FIXED LIGHTING OUTLETS COUNT 15
LOW ENERGY FIXED LIGHT COUNT 15
UPRN 100030752880
UPRN SOURCE Energy Assessor
REPORT TYPE 2
Source file certificates-2021.csv
COUNTRY England
REGION E12000004
Address display
Nation ew