Energy Performance Certificate

31, Doe Quarry Lane, Dinnington, S25 2NJ

EPC Report

Energy rating

Current: 2 G | Potential: 88 B
Current Potential A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 2 G Current: 2 G 88 B Potential: 88 B

Environmental impact (CO₂)

Current: 17 | Potential: 87
Current Potential A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 17 Current: 17 87 Potential: 87
Field Value
LMK KEY 0147-2836-7974-9396-6505
ADDRESS1 31, Doe Quarry Lane
ADDRESS2 Dinnington
ADDRESS3
POSTCODE S25 2NJ
BUILDING REFERENCE NUMBER
CURRENT ENERGY RATING G
POTENTIAL ENERGY RATING B
CURRENT ENERGY EFFICIENCY 2
POTENTIAL ENERGY EFFICIENCY 88
PROPERTY TYPE House
BUILT FORM End-Terrace
INSPECTION DATE 2016-03-16
LOCAL AUTHORITY E08000018
CONSTITUENCY E14001451
COUNTY
LODGEMENT DATE 2016-03-17
TRANSACTION TYPE Marketed sale
ENVIRONMENT IMPACT CURRENT 17
ENVIRONMENT IMPACT POTENTIAL 87
ENERGY CONSUMPTION CURRENT 799
ENERGY CONSUMPTION POTENTIAL 93
CO2 EMISSIONS CURRENT 11
CO2 EMISS CURR PER FLOOR AREA 135
CO2 EMISSIONS POTENTIAL 1.3
LIGHTING COST CURRENT 92
LIGHTING COST POTENTIAL 53
HEATING COST CURRENT 2558
HEATING COST POTENTIAL 447
HOT WATER COST CURRENT 523
HOT WATER COST POTENTIAL 56
TOTAL FLOOR AREA 80
ENERGY TARIFF Single
MAINS GAS FLAG Y
FLOOR LEVEL
FLAT TOP STOREY N
FLAT STOREY COUNT 2
MAIN HEATING CONTROLS None
MULTI GLAZE PROPORTION 10
GLAZED TYPE double glazing installed before 2002
GLAZED AREA Normal
EXTENSION COUNT 1
NUMBER HABITABLE ROOMS 3
NUMBER HEATED ROOMS 0
LOW ENERGY LIGHTING 25
NUMBER OPEN FIREPLACES 0
HOTWATER DESCRIPTION No system present: electric immersion assumed
HOT WATER ENERGY EFF Very Poor
HOT WATER ENV EFF Poor
FLOOR DESCRIPTION Solid, no insulation (assumed)
FLOOR ENERGY EFF N/A
FLOOR ENV EFF N/A
WINDOWS DESCRIPTION Some double glazing
WINDOWS ENERGY EFF Very Poor
WINDOWS ENV EFF Very Poor
WALLS DESCRIPTION Solid brick, as built, no insulation (assumed)
WALLS ENERGY EFF Very Poor
WALLS ENV EFF Very Poor
SECONDHEAT DESCRIPTION None
SHEATING ENERGY EFF N/A
SHEATING ENV EFF N/A
ROOF DESCRIPTION Pitched, 250 mm loft insulation
ROOF ENERGY EFF Good
ROOF ENV EFF Good
MAINHEAT DESCRIPTION No system present: electric heaters assumed
MAINHEAT ENERGY EFF Very Poor
MAINHEAT ENV EFF Poor
MAINHEATCONT DESCRIPTION None
MAINHEATC ENERGY EFF Very Poor
MAINHEATC ENV EFF Very Poor
LIGHTING DESCRIPTION Low energy lighting in 25% of fixed outlets
LIGHTING ENERGY EFF Average
LIGHTING ENV EFF Average
MAIN FUEL To be used only when there is no heating/hot-water system or data is from a community network
WIND TURBINE COUNT 0
HEAT LOSS CORRIDOR
UNHEATED CORRIDOR LENGTH
FLOOR HEIGHT 2.66
PHOTO SUPPLY 0
SOLAR WATER HEATING FLAG N
MECHANICAL VENTILATION natural
ADDRESS 31, Doe Quarry Lane, Dinnington
LOCAL AUTHORITY LABEL Rotherham
CONSTITUENCY LABEL Rother Valley
POSTTOWN SHEFFIELD
CONSTRUCTION AGE BAND England and Wales: 1900-1929
LODGEMENT DATETIME 2016-03-17 11:47:19
TENURE owner-occupied
FIXED LIGHTING OUTLETS COUNT 8
LOW ENERGY FIXED LIGHT COUNT 2
UPRN 100050886146
UPRN SOURCE Energy Assessor
REPORT TYPE 2
Source file certificates-2016.csv
COUNTRY England
REGION E12000003
Address display
Nation ew