Energy Performance Certificate

2, Fairfield Avenue, Droylsden, M43 6ED

EPC Report

Energy rating

Current: 41 E | Potential: 73 C
Current Potential A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 41 E Current: 41 E 73 C Potential: 73 C

Environmental impact (CO₂)

Current: 32 | Potential: 65
Current Potential A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 32 Current: 32 65 Potential: 65
Field Value
LMK KEY 0104-2817-7475-9525-4385
ADDRESS1 2, Fairfield Avenue
ADDRESS2 Droylsden
ADDRESS3
POSTCODE M43 6ED
BUILDING REFERENCE NUMBER
CURRENT ENERGY RATING E
POTENTIAL ENERGY RATING C
CURRENT ENERGY EFFICIENCY 41
POTENTIAL ENERGY EFFICIENCY 73
PROPERTY TYPE House
BUILT FORM Semi-Detached
INSPECTION DATE 2015-03-23
LOCAL AUTHORITY E08000008
CONSTITUENCY E14001070
COUNTY
LODGEMENT DATE 2015-03-24
TRANSACTION TYPE ECO assessment
ENVIRONMENT IMPACT CURRENT 32
ENVIRONMENT IMPACT POTENTIAL 65
ENERGY CONSUMPTION CURRENT 399
ENERGY CONSUMPTION POTENTIAL 175
CO2 EMISSIONS CURRENT 12
CO2 EMISS CURR PER FLOOR AREA 70
CO2 EMISSIONS POTENTIAL 5.4
LIGHTING COST CURRENT 126
LIGHTING COST POTENTIAL 84
HEATING COST CURRENT 2298
HEATING COST POTENTIAL 1162
HOT WATER COST CURRENT 113
HOT WATER COST POTENTIAL 114
TOTAL FLOOR AREA 174
ENERGY TARIFF Single
MAINS GAS FLAG Y
FLOOR LEVEL
FLAT TOP STOREY N
FLAT STOREY COUNT 2
MAIN HEATING CONTROLS Programmer, no room thermostat
MULTI GLAZE PROPORTION 100
GLAZED TYPE double glazing installed before 2002
GLAZED AREA Normal
EXTENSION COUNT 2
NUMBER HABITABLE ROOMS 11
NUMBER HEATED ROOMS 11
LOW ENERGY LIGHTING 50
NUMBER OPEN FIREPLACES 0
HOTWATER DESCRIPTION From main system
HOT WATER ENERGY EFF Good
HOT WATER ENV EFF Good
FLOOR DESCRIPTION Suspended, no insulation (assumed)
FLOOR ENERGY EFF N/A
FLOOR ENV EFF N/A
WINDOWS DESCRIPTION Fully double glazed
WINDOWS ENERGY EFF Average
WINDOWS ENV EFF Average
WALLS DESCRIPTION Cavity wall, as built, no insulation (assumed)
WALLS ENERGY EFF Very Poor
WALLS ENV EFF Very Poor
SECONDHEAT DESCRIPTION None
SHEATING ENERGY EFF N/A
SHEATING ENV EFF N/A
ROOF DESCRIPTION Pitched, no insulation (assumed)
ROOF ENERGY EFF Very Poor
ROOF ENV EFF Very Poor
MAINHEAT DESCRIPTION Boiler and radiators, mains gas, Boiler and radiators, mains gas
MAINHEAT ENERGY EFF Good
MAINHEAT ENV EFF Good
MAINHEATCONT DESCRIPTION Programmer, no room thermostat
MAINHEATC ENERGY EFF Very Poor
MAINHEATC ENV EFF Very Poor
LIGHTING DESCRIPTION Low energy lighting in 50% of fixed outlets
LIGHTING ENERGY EFF Good
LIGHTING ENV EFF Good
MAIN FUEL mains gas (not community)
WIND TURBINE COUNT 0
HEAT LOSS CORRIDOR
UNHEATED CORRIDOR LENGTH
FLOOR HEIGHT 2.98
PHOTO SUPPLY 0
SOLAR WATER HEATING FLAG N
MECHANICAL VENTILATION natural
ADDRESS 2, Fairfield Avenue, Droylsden
LOCAL AUTHORITY LABEL Tameside
CONSTITUENCY LABEL Ashton-under-Lyne
POSTTOWN MANCHESTER
CONSTRUCTION AGE BAND England and Wales: before 1900
LODGEMENT DATETIME 2015-03-24 08:49:34
TENURE rented (private)
FIXED LIGHTING OUTLETS COUNT 24
LOW ENERGY FIXED LIGHT COUNT 12
UPRN 100012711805
UPRN SOURCE Energy Assessor
REPORT TYPE 2
Source file certificates-2015.csv
COUNTRY England
REGION E12000002
Address display
Nation ew