Energy Performance Certificate

2, Carr Field, Bamber Bridge, PR5 8BS

EPC Report

Energy rating

Current: 82 B | Potential: 87 B
Current Potential A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 82 B Current: 82 B 87 B Potential: 87 B

Environmental impact (CO₂)

Current: 81 | Potential: 88
Current Potential A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 81 Current: 81 88 Potential: 88
Field Value
LMK KEY 0100-2876-7247-9727-6461
ADDRESS1 2, Carr Field
ADDRESS2 Bamber Bridge
ADDRESS3
POSTCODE PR5 8BS
BUILDING REFERENCE NUMBER
CURRENT ENERGY RATING B
POTENTIAL ENERGY RATING B
CURRENT ENERGY EFFICIENCY 82
POTENTIAL ENERGY EFFICIENCY 87
PROPERTY TYPE Bungalow
BUILT FORM Detached
INSPECTION DATE 2013-04-26
LOCAL AUTHORITY E07000118
CONSTITUENCY E14001170
COUNTY
LODGEMENT DATE 2013-04-26
TRANSACTION TYPE FiT application
ENVIRONMENT IMPACT CURRENT 81
ENVIRONMENT IMPACT POTENTIAL 88
ENERGY CONSUMPTION CURRENT 113
ENERGY CONSUMPTION POTENTIAL 74
CO2 EMISSIONS CURRENT 1.6
CO2 EMISS CURR PER FLOOR AREA 23
CO2 EMISSIONS POTENTIAL 1.0
LIGHTING COST CURRENT 49
LIGHTING COST POTENTIAL 49
HEATING COST CURRENT 470
HEATING COST POTENTIAL 402
HOT WATER COST CURRENT 81
HOT WATER COST POTENTIAL 58
TOTAL FLOOR AREA 68
ENERGY TARIFF Single
MAINS GAS FLAG
FLOOR LEVEL
FLAT TOP STOREY N
FLAT STOREY COUNT 1
MAIN HEATING CONTROLS Programmer and room thermostat
MULTI GLAZE PROPORTION 100
GLAZED TYPE
GLAZED AREA
EXTENSION COUNT 0
NUMBER HABITABLE ROOMS 4
NUMBER HEATED ROOMS 4
LOW ENERGY LIGHTING 78
NUMBER OPEN FIREPLACES 0
HOTWATER DESCRIPTION From main system
HOT WATER ENERGY EFF Good
HOT WATER ENV EFF Good
FLOOR DESCRIPTION Solid, no insulation (assumed)
FLOOR ENERGY EFF N/A
FLOOR ENV EFF N/A
WINDOWS DESCRIPTION Fully double glazed
WINDOWS ENERGY EFF Average
WINDOWS ENV EFF Average
WALLS DESCRIPTION Cavity wall, filled cavity
WALLS ENERGY EFF Good
WALLS ENV EFF Good
SECONDHEAT DESCRIPTION Room heaters, mains gas
SHEATING ENERGY EFF N/A
SHEATING ENV EFF N/A
ROOF DESCRIPTION Pitched, 300+ mm loft insulation
ROOF ENERGY EFF Very Good
ROOF ENV EFF Very Good
MAINHEAT DESCRIPTION Boiler and radiators, mains gas
MAINHEAT ENERGY EFF Good
MAINHEAT ENV EFF Good
MAINHEATCONT DESCRIPTION Programmer and room thermostat
MAINHEATC ENERGY EFF Average
MAINHEATC ENV EFF Average
LIGHTING DESCRIPTION Low energy lighting in 78% of fixed outlets
LIGHTING ENERGY EFF Very Good
LIGHTING ENV EFF Very Good
MAIN FUEL mains gas (not community)
WIND TURBINE COUNT 0
HEAT LOSS CORRIDOR
UNHEATED CORRIDOR LENGTH
FLOOR HEIGHT 2.34
PHOTO SUPPLY
SOLAR WATER HEATING FLAG N
MECHANICAL VENTILATION natural
ADDRESS 2, Carr Field, Bamber Bridge
LOCAL AUTHORITY LABEL Chorley
CONSTITUENCY LABEL Chorley
POSTTOWN PRESTON
CONSTRUCTION AGE BAND England and Wales: 1976-1982
LODGEMENT DATETIME 2013-04-26 21:31:27
TENURE Owner-occupied
FIXED LIGHTING OUTLETS COUNT 9
LOW ENERGY FIXED LIGHT COUNT 7
UPRN 100010392055
UPRN SOURCE Energy Assessor
REPORT TYPE 2
Source file certificates-2013.csv
COUNTRY England
REGION E12000002
Address display
Nation ew