Energy Performance Certificate

6 HOPE PARK, BROMLEY, BR1 3RQ

EPC Report

Energy rating

Current: 71 C | Potential: 81 B
Current Potential A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 71 C Current: 71 C 81 B Potential: 81 B

Environmental impact (CO₂)

Current: 76 | Potential: 85
Current Potential A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 76 Current: 76 85 Potential: 85
Field Value
LMK KEY 0100-2644-2090-2099-9225
ADDRESS1 6 HOPE PARK
ADDRESS2 BROMLEY
ADDRESS3
POSTCODE BR1 3RQ
BUILDING REFERENCE NUMBER
CURRENT ENERGY RATING C
POTENTIAL ENERGY RATING B
CURRENT ENERGY EFFICIENCY 71
POTENTIAL ENERGY EFFICIENCY 81
PROPERTY TYPE Flat
BUILT FORM Mid-Terrace
INSPECTION DATE 2021-01-14
LOCAL AUTHORITY E09000006
CONSTITUENCY E14001137
COUNTY
LODGEMENT DATE 2021-01-20
TRANSACTION TYPE ECO assessment
ENVIRONMENT IMPACT CURRENT 76
ENVIRONMENT IMPACT POTENTIAL 85
ENERGY CONSUMPTION CURRENT 172
ENERGY CONSUMPTION POTENTIAL 112
CO2 EMISSIONS CURRENT 1.5
CO2 EMISS CURR PER FLOOR AREA 30
CO2 EMISSIONS POTENTIAL 1.0
LIGHTING COST CURRENT 48
LIGHTING COST POTENTIAL 48
HEATING COST CURRENT 189
HEATING COST POTENTIAL 157
HOT WATER COST CURRENT 306
HOT WATER COST POTENTIAL 99
TOTAL FLOOR AREA 51
ENERGY TARIFF Single
MAINS GAS FLAG Y
FLOOR LEVEL 2
FLAT TOP STOREY N
FLAT STOREY COUNT 1
MAIN HEATING CONTROLS No thermostatic control of room temperature
MULTI GLAZE PROPORTION 100
GLAZED TYPE double glazing, unknown install date
GLAZED AREA Normal
EXTENSION COUNT 0
NUMBER HABITABLE ROOMS 3
NUMBER HEATED ROOMS 3
LOW ENERGY LIGHTING 100
NUMBER OPEN FIREPLACES 0
HOTWATER DESCRIPTION Electric immersion, standard tariff
HOT WATER ENERGY EFF Very Poor
HOT WATER ENV EFF Poor
FLOOR DESCRIPTION (another dwelling below)
FLOOR ENERGY EFF N/A
FLOOR ENV EFF N/A
WINDOWS DESCRIPTION Fully double glazed
WINDOWS ENERGY EFF Average
WINDOWS ENV EFF Average
WALLS DESCRIPTION Cavity wall, filled cavity
WALLS ENERGY EFF Good
WALLS ENV EFF Good
SECONDHEAT DESCRIPTION None
SHEATING ENERGY EFF N/A
SHEATING ENV EFF N/A
ROOF DESCRIPTION (another dwelling above)
ROOF ENERGY EFF N/A
ROOF ENV EFF N/A
MAINHEAT DESCRIPTION Room heaters, mains gas
MAINHEAT ENERGY EFF Average
MAINHEAT ENV EFF Average
MAINHEATCONT DESCRIPTION No thermostatic control of room temperature
MAINHEATC ENERGY EFF Poor
MAINHEATC ENV EFF Poor
LIGHTING DESCRIPTION Low energy lighting in all fixed outlets
LIGHTING ENERGY EFF Very Good
LIGHTING ENV EFF Very Good
MAIN FUEL mains gas (not community)
WIND TURBINE COUNT 0
HEAT LOSS CORRIDOR unheated corridor
UNHEATED CORRIDOR LENGTH 6.65
FLOOR HEIGHT 2.47
PHOTO SUPPLY 0
SOLAR WATER HEATING FLAG N
MECHANICAL VENTILATION natural
ADDRESS 6 HOPE PARK, BROMLEY
LOCAL AUTHORITY LABEL Bromley
CONSTITUENCY LABEL Bromley and Biggin Hill
POSTTOWN BROMLEY
CONSTRUCTION AGE BAND England and Wales: 1983-1990
LODGEMENT DATETIME 2021-01-20 11:07:49
TENURE rented (private)
FIXED LIGHTING OUTLETS COUNT 7
LOW ENERGY FIXED LIGHT COUNT 7
UPRN 100020402647
UPRN SOURCE Energy Assessor
REPORT TYPE 2
Source file certificates-2021.csv
COUNTRY England
REGION E12000007
Address display
Nation ew