Energy Performance Certificate

1 BEDLAM WALK, CHICHELEY, MK16 9JG

EPC Report

Energy rating

Current: 48 E | Potential: 62 D
Current Potential A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 48 E Current: 48 E 62 D Potential: 62 D

Environmental impact (CO₂)

Current: 64 | Potential: 75
Current Potential A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 64 Current: 64 75 Potential: 75
Field Value
LMK KEY 0080-2806-6040-2509-3291
ADDRESS1 1 BEDLAM WALK
ADDRESS2 CHICHELEY
ADDRESS3
POSTCODE MK16 9JG
BUILDING REFERENCE NUMBER
CURRENT ENERGY RATING E
POTENTIAL ENERGY RATING D
CURRENT ENERGY EFFICIENCY 48
POTENTIAL ENERGY EFFICIENCY 62
PROPERTY TYPE House
BUILT FORM End-Terrace
INSPECTION DATE 2021-04-06
LOCAL AUTHORITY E06000042
CONSTITUENCY E14001370
COUNTY
LODGEMENT DATE 2021-04-09
TRANSACTION TYPE Marketed sale
ENVIRONMENT IMPACT CURRENT 64
ENVIRONMENT IMPACT POTENTIAL 75
ENERGY CONSUMPTION CURRENT 153
ENERGY CONSUMPTION POTENTIAL 97
CO2 EMISSIONS CURRENT 5.3
CO2 EMISS CURR PER FLOOR AREA 33
CO2 EMISSIONS POTENTIAL 3.6
LIGHTING COST CURRENT 106
LIGHTING COST POTENTIAL 106
HEATING COST CURRENT 1301
HEATING COST POTENTIAL 1148
HOT WATER COST CURRENT 175
HOT WATER COST POTENTIAL 117
TOTAL FLOOR AREA 159
ENERGY TARIFF Single
MAINS GAS FLAG N
FLOOR LEVEL
FLAT TOP STOREY N
FLAT STOREY COUNT 2
MAIN HEATING CONTROLS Programmer, room thermostat and TRVs
MULTI GLAZE PROPORTION 100
GLAZED TYPE double glazing, unknown install date
GLAZED AREA Normal
EXTENSION COUNT 2
NUMBER HABITABLE ROOMS 6
NUMBER HEATED ROOMS 6
LOW ENERGY LIGHTING 100
NUMBER OPEN FIREPLACES 0
HOTWATER DESCRIPTION From main system
HOT WATER ENERGY EFF Poor
HOT WATER ENV EFF Good
FLOOR DESCRIPTION Suspended, no insulation (assumed)
FLOOR ENERGY EFF N/A
FLOOR ENV EFF N/A
WINDOWS DESCRIPTION Fully double glazed
WINDOWS ENERGY EFF Average
WINDOWS ENV EFF Average
WALLS DESCRIPTION Cavity wall, as built, insulated (assumed)
WALLS ENERGY EFF Good
WALLS ENV EFF Good
SECONDHEAT DESCRIPTION None
SHEATING ENERGY EFF N/A
SHEATING ENV EFF N/A
ROOF DESCRIPTION Pitched, 200 mm loft insulation
ROOF ENERGY EFF Good
ROOF ENV EFF Good
MAINHEAT DESCRIPTION Boiler and radiators, LPG
MAINHEAT ENERGY EFF Poor
MAINHEAT ENV EFF Good
MAINHEATCONT DESCRIPTION Programmer, room thermostat and TRVs
MAINHEATC ENERGY EFF Good
MAINHEATC ENV EFF Good
LIGHTING DESCRIPTION Low energy lighting in all fixed outlets
LIGHTING ENERGY EFF Very Good
LIGHTING ENV EFF Very Good
MAIN FUEL LPG (not community)
WIND TURBINE COUNT 0
HEAT LOSS CORRIDOR
UNHEATED CORRIDOR LENGTH
FLOOR HEIGHT 2.44
PHOTO SUPPLY 0
SOLAR WATER HEATING FLAG N
MECHANICAL VENTILATION natural
ADDRESS 1 BEDLAM WALK, CHICHELEY
LOCAL AUTHORITY LABEL Milton Keynes
CONSTITUENCY LABEL Milton Keynes North
POSTTOWN CHICHELEY
CONSTRUCTION AGE BAND England and Wales: 1991-1995
LODGEMENT DATETIME 2021-04-09 17:07:56
TENURE owner-occupied
FIXED LIGHTING OUTLETS COUNT 50
LOW ENERGY FIXED LIGHT COUNT 50
UPRN 25086838
UPRN SOURCE Energy Assessor
REPORT TYPE 2
Source file certificates-2021.csv
COUNTRY England
REGION E12000008
Address display
Nation ew