Energy Performance Certificate

108B GILLINGHAM ROAD, ME7 4ER

EPC Report

Energy rating

Current: 73 C | Potential: 75 C
Current Potential A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 73 C Current: 73 C 75 C Potential: 75 C

Environmental impact (CO₂)

Current: 74 | Potential: 76
Current Potential A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 74 Current: 74 76 Potential: 76
Field Value
LMK KEY 0010-2117-6060-2409-2425
ADDRESS1 108B GILLINGHAM ROAD
ADDRESS2
ADDRESS3
POSTCODE ME7 4ER
BUILDING REFERENCE NUMBER
CURRENT ENERGY RATING C
POTENTIAL ENERGY RATING C
CURRENT ENERGY EFFICIENCY 73
POTENTIAL ENERGY EFFICIENCY 75
PROPERTY TYPE Maisonette
BUILT FORM End-Terrace
INSPECTION DATE 2021-06-03
LOCAL AUTHORITY E06000035
CONSTITUENCY E14001246
COUNTY
LODGEMENT DATE 2021-06-03
TRANSACTION TYPE Rental
ENVIRONMENT IMPACT CURRENT 74
ENVIRONMENT IMPACT POTENTIAL 76
ENERGY CONSUMPTION CURRENT 191
ENERGY CONSUMPTION POTENTIAL 176
CO2 EMISSIONS CURRENT 1.8
CO2 EMISS CURR PER FLOOR AREA 34
CO2 EMISSIONS POTENTIAL 1.7
LIGHTING COST CURRENT 56
LIGHTING COST POTENTIAL 56
HEATING COST CURRENT 324
HEATING COST POTENTIAL 299
HOT WATER COST CURRENT 80
HOT WATER COST POTENTIAL 80
TOTAL FLOOR AREA 54
ENERGY TARIFF dual
MAINS GAS FLAG Y
FLOOR LEVEL 3
FLAT TOP STOREY Y
FLAT STOREY COUNT 1
MAIN HEATING CONTROLS Programmer, room thermostat and TRVs
MULTI GLAZE PROPORTION 100
GLAZED TYPE double glazing, unknown install date
GLAZED AREA Normal
EXTENSION COUNT 0
NUMBER HABITABLE ROOMS 3
NUMBER HEATED ROOMS 3
LOW ENERGY LIGHTING 100
NUMBER OPEN FIREPLACES 0
HOTWATER DESCRIPTION From main system
HOT WATER ENERGY EFF Good
HOT WATER ENV EFF Good
FLOOR DESCRIPTION (another dwelling below)
FLOOR ENERGY EFF N/A
FLOOR ENV EFF N/A
WINDOWS DESCRIPTION Fully double glazed
WINDOWS ENERGY EFF Average
WINDOWS ENV EFF Average
WALLS DESCRIPTION Solid brick, as built, insulated (assumed)
WALLS ENERGY EFF Good
WALLS ENV EFF Good
SECONDHEAT DESCRIPTION None
SHEATING ENERGY EFF N/A
SHEATING ENV EFF N/A
ROOF DESCRIPTION Pitched, 100 mm loft insulation
ROOF ENERGY EFF Average
ROOF ENV EFF Average
MAINHEAT DESCRIPTION Boiler and radiators, mains gas
MAINHEAT ENERGY EFF Good
MAINHEAT ENV EFF Good
MAINHEATCONT DESCRIPTION Programmer, room thermostat and TRVs
MAINHEATC ENERGY EFF Good
MAINHEATC ENV EFF Good
LIGHTING DESCRIPTION Low energy lighting in all fixed outlets
LIGHTING ENERGY EFF Very Good
LIGHTING ENV EFF Very Good
MAIN FUEL mains gas (not community)
WIND TURBINE COUNT 0
HEAT LOSS CORRIDOR no corridor
UNHEATED CORRIDOR LENGTH
FLOOR HEIGHT 2.657
PHOTO SUPPLY 0
SOLAR WATER HEATING FLAG N
MECHANICAL VENTILATION natural
ADDRESS 108B GILLINGHAM ROAD
LOCAL AUTHORITY LABEL Medway
CONSTITUENCY LABEL Gillingham and Rainham
POSTTOWN GILLINGHAM
CONSTRUCTION AGE BAND England and Wales: 1983-1990
LODGEMENT DATETIME 2021-06-03 13:07:07
TENURE owner-occupied
FIXED LIGHTING OUTLETS COUNT 7
LOW ENERGY FIXED LIGHT COUNT 7
UPRN 44116123
UPRN SOURCE Energy Assessor
REPORT TYPE 2
Source file certificates-2021.csv
COUNTRY England
REGION E12000008
Address display
Nation ew